Download (h264 .mp4) or Watch
Buy USD 1.99
Watch
Trailer

Coloured concrete construction source

40 Mins Audio: English (US) Maturity Rating ALL

Coloured concrete construction source Texturing Advanced planning formwork installation Texture Selection Placement strategy Color selection Always make a representative sample for pre-approval Brickform products are intended for professional use only Preparation Reinforcement may be required or specified Surrounding areas, landscaping & adjacent surfaces should be protected & masked Concrete placement Color hardener application Texture application Clean & Seal A pressure washer may remove more release than desired, or possibly cause damage Always refer to the technical data sheet for complete application guidelines Stenciling Brickform products are intended for professional use only Color hardener application Texturing With certain patterns a frayed or rough edge may be suitable Clean & Seal Allow sufficient time for moisture evaporation to occur Always refer to the technical data sheet for complete application guidelines Dye-N-Seal New concrete should be cured for at least 28 days. Surface must be free of sealers, oils, paint, alkali, or any foreign material. First application coat Second application coat Seal to protect Micro-Topping New concrete should be cured for at least 28 days. Surface must be free of dirt, oil, paint, moss, dust or any contaminants. Repair imperfections First application coat 60-80 grit sanding disc Second application coat Hydrate for 1 full day Blush-Tone acid stain A chemical reaction must take place. Blush-tone is not effective on older, weathered concrete or a heavily sandblasted serface. Always test for suitability before proceeding. New concrete should be cured for at least 28 days. Surface must be free of sealers, oils, paint, alkali, or any foreign material. When working with acid, avoid contact with skin and clothes. Protect adjacent areas from overspray and runoff. Application Apply acid stain Brush to even out material Neutralize the Acid Follow the same path Remove residue & water Dry at least 24 hours Seal to protect Sealing & Maintenance Gem-Seal Area must be completely clean, dry and un-sealed. Surface must be free of oil, dirt, wax or any any substance that prevents bonding. If using a roller, apply in thin coats, maintain a "wet edge", and do not back-brush. Dura-Wax

Category
Howto & Style

Audio
English (US)

Comments